Heinrich Kunter Technical Economic Institute.
Construction and building services
Bolzano
2015-2018
“Heinrich Kunter” Technical Economic Institute, Bolzano. Redevelopment and extension of the school’s detached premises.
The “Heinrich Kunter” Technical Economic Institute building is located in Via Max Valier.
The project involved the rehabilitation of the existing building and the construction of a new structure in the area of the old workshops, connected to the previous building by a glazed volume. All works were carried out in full compliance with CasaClima Class B criteria. The new building has an area of approximately 3,600 m² over several levels. The ground floor opens onto the rear garden with a gymnasium and a dining hall for 750 people. The upper floors accommodate 8 classrooms and 4 computer rooms, while the basement includes the kitchen and an independent multi-purpose room for extracurricular activities.
The existing building underwent a radical redistribution of its interior spaces; the heating plant and the low-temperature heating system were completely renewed and expanded, supplying energy to radiant floors and ceilings, in addition to a modern ventilation system that ensures adequate air renewal.

























